| Completion filing | 2023-04-17 | Shenye Zhongcheng Dongbao Seafood Hot Pot Restaurant Hard Fit-out Project | A15M00032304130002 | Completion acceptance filing completed |
| Design change | 2020-12-10 | Shenye Zhongcheng Project Plots B302-0040 (formerly Plots 05-01) Phase I High- and Low-Voltage Transformer and Distribution Works | 2020121009244731 | Shenye Zhongcheng Project Plots B302-0040 (formerly Plots 05-01) Phase I High- and Low-Voltage Transformer and Distribution Works Design Change M-E018: 1, split the drawings as required by the power supply bureau into three sets for residential, commercial and kindergarten use; see "Post-change: Shenye Zhongcheng Drawing Set".[br]2, add metering schematic diagrams; "Post-change: Shenye Zhongcheng Drawing Set" contains metering schematics E0206a, E0406b and E0706a.[br]3, add the temporary generator location and connection points; see "Post-change |
| Design change | 2020-11-06 | Shenye Zhongcheng Plots B302-0040 (formerly Plots 05-01) Phase I General Construction Contracting Works | 202011061507563 | Shenye Zhongcheng Plots B302-0040 (formerly Plots 05-01) Phase I General Construction Contracting Works: 1, change the external 1 and external 8 specification from "10 thick polymer cement mortar levelling layer" to "20 thick M10 pre-mixed fibre cement mortar levelling layer (applied in two coats)", and from "1.2 thick polymer cement waterproof coating (Type II, Type III)" to "3 thick polymer cement waterproof mortar (with alkali-resistant fibreglass mesh embedded)"; see attached drawings for details. 2, change the external 3 specification from "15 thick aluminium silicate insulation coating" to "30 thick non- |
| Design change | 2020-05-26 | Shenye Zhongcheng Plots B302-0040 (formerly Plots 05-01) Phase I General Construction Contracting Works | 2020052611055850 | Shenye Zhongcheng Plots B302-0040 (formerly Plots 05-01) Phase I General Construction Contracting Works M-E017 Design Change: Change content: because charging piles are added in the basement, the electrical design is supplemented with distribution, adding distribution boxes, wires, cables, cable trays, conduits, etc.; the charging pile equipment is not within the scope of this construction contract. The specific content corresponding to change points 1–8 is as follows: 1, supplement charging pile distribution on basement level 1; see plans E9208 (G1), E9209 (G1), E9210 (G1), E9211 (G |
| Fire safety acceptance | 2020-01-19 | Full-floor renovation works, Floor 12, Shum Yip Zhongcheng Tower | Shenfu Zhujian Xiao Yan Zi [ 2020 ] No. 0018 | Qualified |
| Planning acceptance inspection | 2019-12-27 | Shenye Zhongcheng (深业中城) | Shenzhen Planning and Natural Resources Construction Verification No. FT-2019-0025 | Planning acceptance certificate obtained |
| Fire safety acceptance | 2019-08-19 | Full-floor renovation works, Floor 11, Shum Yip Zhongcheng Tower | Shenfu Zhujian Xiao Yan Zi [ 2019 ] No. 0304 | Qualified |
| Design change | 2019-07-29 | Shenye Zhongcheng Project Plots B302-0040 (formerly Plots 05-01) Central Air-Conditioning Works | 201907291557526 | Shenye Zhongcheng Project Plots B302-0040 (formerly Plots 05-01) Central Air-Conditioning Works – Design Change M2-M011: 1, 6 Block A: cancel the 35th-floor central air-conditioning works 2, Note: the uploaded drawings only include the pre-change drawings; the change consists solely of cancelling a floor, and the design submission only provides the corresponding description without attached drawings. |